ENVIRONMENTAL INVESTMENTS
Waste disposal construction, flood protection, highway
embankments as flood protection, reservoirs and dams.
- Pusztazámor, construction of solid waste dumping site
- Nagykanizsa, Letenye, Zalakaros, construction of waste disposal facilities
- South-Balaton and Sió Walley, construction of the regional and communal waste management system
- Implementation of the Sajó-Bódva Valley regional waste management program
- Relocation of the protection embankment of Lake Bivaly. The project included 780,000 m³ of earthworks to build a new section
of the Tisza protection embankment. This contract was carried out between 2005 and 2008 in the value of USD 140 M - Dam Rovni reservoir construction in Szerbia
- Poroszlói pool – wetlands dredging (Tisza Lake-project)
- Berettyó River – protective dam developmen
- Bodrogközi upper Tisza River and Bodrog River – left bank flood protection system development
- Bereg ‒ Flood reducing reservoir consruction, Stage I. and III.
IN PROGRESS
Here are a few of our ongoing projects which may provide
excellent references for our company.
- Sri Lanka – Reconstruction Labugama treatment plant USD 19,9M.
- Sri Lanka – Reconstruction Kalatuwawa treatment plant USD 19,5M.
- Siófok wastewater treatment plant construction
- Tisza floodplain embankment replacement works on section between Szolnok railroad bridge and Kisköre
- Upper-Tisza flood protection line construction, on the section above Tivadar Bridge
- 2-to-4-lane expansion between highway no. 21, section II and Pásztó bypass
- M30 expressway construction between Tornyosnémeti and the country borders