Successful Projects

MOTORWAYS
Between 2003 and 2016 our company worked on several motorway projects in Hungary. All these motorway stages are parts of the Trans European Network standard including two traffics- and one emergency lane on both sides. Intersections and drainage system were also carried out by our company. Complete asphalt and basalt-concrete motorway construction, embankment, carriageway, traffic engineering, and these subareas.

Motorway No. M7 from Balatonszárszó to Ordacsehi

(125+350 – 145+00 kms)

Name of employer:
Nemzeti Infrastruktúra Fejlesztő Zrt.
Employer address:
H-1134 Budapest, Váci út 45.
Brief description of the works:
Road and bridge construction
Contract price:
USD 190,501.027,-
Earthworks:
7,015,039 m³
Total surface of asphalt pavement structure:
1,855,489 m²

Motorway No. M7 from Nagykanizsa to Becsehely

(206+200 – 224+282 kms)

Name of employer:
Nemzeti Infrastruktúra Fejlesztő Zrt.
Brief description of the works:
Road and bridge construction
Contract price:
USD 163,221.857,-
Earthworks:
4,420,035 m³
Total surface of asphalt pavement structure:
794,187 m²
Construction of:
24 bridges

Motorway No. M3 from Görbeháza to Nyíregyháza

(187+150 – 226+098 kms)

Name of employer:
Nemzeti Infrastruktúra Fejlesztő Zrt.
Brief description of the works:
Road and bridge construction
Contract price:
USD 380,542.178,-
Earthworks:
6,182,000 m³
Total surface of asphalt pavement structure:
1,299,000 m²
Construction of:
28 bridges

Highway No. M43

(from 18+400 – 34+600 kms)

Name of employer:
Nemzeti Infrastruktúra Fejlesztő Zrt.
Brief description of the works:
Motorway construction
Contract price:
USD 81,440.092,-
Earthworks:
866,067 m³
Total surface of asphalt pavement structure:
273,322 m²

Motorway No. M0

(from 23+200 – 29+500 kms)

Name of employer:
Nemzeti Infrastruktúra Fejlesztő Zrt.
Brief description of the works:
Motorway construction
Contract price:
USD 44,309.026,-
Earthworks:
646,466 m³
Total surface of concrete pavement structure:
113,424 m²
COUNTRY ROADS
For noise and accident prevention reasons, new country roads, roundabouts and bypass roads have been constructed. New 2×1 lane and 2×2 lane countryroads and expressways, roundabouts and bypasses were built in the last five years, nearly 100 kilometers in summary. Foundation, embankment construction, pavement, underpass, flyover, roundabout construction with supplementary works. Our constantly developing fleet of machines and asphalt-mixing network is available to provide a nationwide coverage.
Highway No. 8
between the 11th and 14th kilometers
Highway No. 4
Törökszentmiklós bypass section
Highway No. 4
construction of Hajdúszoboszló bypass section
Highway No. 56
Szekszárd bypass section
Highway No. 63
Székesfehérvár bypass section
Highway No. 8
Csór bypass section
Highway No. 47
Orosháza bypass section
Highway No. 13
Komárom south bypass section
Highway No. 62
Seregélyes bypass section
Highway No. 8
Várpalota – Veszprém approaching section
Highway No. 6-65
approaching section
Highway No. 8
Székesfehérvár bypass section
Highway No. 71
Keszthely bypass section
M60 motorway
construction of the section and related facilities between the 58th highway and linking road no. 5826
M30–26 motorway
Miskolc North bypass – small- and medium voltage network, public lighting
M30–26 motorway
Miskolc North bypass – embankment and dam construction, building in Reno mattresses
MOTORWAY RECONSTRUCTIONS
Asphalt and concrete surface replacements and renewals, additional lane constructions, ramp reconstructions were carried out owing to the increased Pan-European commercial road traffic on Hungarian highways.
M7 motorway
reconstruction between Budapest and Zamárdi
M3 motorway
surface covering reconstruction between sections (km 15.1–34.02)
M1 motorway
surface reconstruction between sections (km 94.35–105.6)
M1 motorway
surface covering reconstruction of the Mosonmagyaróvár section
M0 ring road
Budapest Ring reconstruction from asphalt to basalt concrete from 2×2 to 3×3 lane
M0 ring road
Budapest Ring – construction section M1 – M7 (basalt concrete)
M0 ring road
reconstruction between highway no 51 and the M5 motorway
M0 ring road
surface construction and building communication systems between the M6 motorway and highway no 51
M0 ring road
construction of the section between M1 and M7 motorways (basalt concrete)
ROAD RECONSTRUCTION
Contracts including residential and country road reconstructions, adding further lanes to existing roads, designing juctions, constructing roundabouts.
Budapest
Váci Str. – M3 approaching section, Hungária Road, Szentendrei Str. and Bartók Béla Str.
Highway No. 44
Surface reinforcement between sections 52-62 kms
Highway No. 4
Reconstruction between sections 165-171 kms
Highway No. 47
Debrecen approaching section
Highway No. 35
Debrecen approaching section
Highway No. 47
Building 4 lanes between Algyő and Hódmezővásárhely
Highway No. 58
Building 4 lanes 3+175-6+00 0 kms, 6+935-9+020 kms
Highway No. 2104
Surface reinforcement between Vác and Gödöllő
Highway No. 3122
Surface reinforcement between Abony and Újszász
Highway No. 3103
Surface reinforcement between Rákoskeresztúr and Isaszeg and Gödöllő
Highway No. 1119
Surface reinforcement between Tát and Tarján
Highway No. 6209
Surface reinforcement between Adony and Kálóz
Highway No. 8127
Surface reinforcement between Mór and Kocs
Highway No. 4814
Surface reinforcement between Létavértes and Debrecen
Highway No. 3228
Surface reinforcement between Jászapáti and Jászszentandrás
Highway No. 3316
Surface reinforcement between Balmazújváros and Hajdúszoboszló
Highway No. 6235
Surface reinforcement between Tengelice and Szedres
Highway No. 41
Surface reinforcement between Vásárosnamény and Beregsurány
WATER TREATMENT AND SEWAGE MANAGEMENT SYSTEM
Contracts including planing and constructing sewage and drinking water treatment plants and networks. (more than 300.000 m³/day)
  • Water treatment plant of Hajdúszoboszló city
  • Water treatment plant of Jászberény city and in its vicinity
  • Water treatment plant and network of Hatvan city
  • Water treatment plant of Szeged and in its vicinity
  • Water treatment plant of Győr city
  • Building of sewage water treatment plant and filtering system of Kecskemét and its vicinity
  • Water treatment plant and network in Debrecen city
  • Wastewater treatment plant and sewage system in Érd and it’s vicinity
  • Building sewage systems in Makó, Apátfalva and Magyarcsanád
  • Building sewage systems in Győrszemere and Tényő
  • Building sewage systems in Kiskunfélegyháza
  • Wastewater treatment plant and sewage system in Csanádpalota
  • Building sewage systems in Siófok
  • Wastewater treatment planning and implementing, developing sewage system in Mindszent
  • Wastewater treatment plant and system construction, sewage system developement in Derecske
  • Sewerage expansion in Tamási
  • Drinking water purification plant and network construction in Szerencs and its vicinity
RAILWAY, UNDERGROUND CONSTRUCTION
Railway embankment and foundation works, flyover, railway, tramline track and bridge constructions.
  • Railway foundation works on the Zalalövő-Bagod line section
  • Railway foundation works on the Albertirsa-Cegléd line
  • Construction of the electrical railway junction at Dugonics Square, Szeged
  • Construction of the tramline track on the Bartók Béla Street, in Budapest
  • Railway constructions works between Zalaegerszeg and Ukk stations
  • Tramline section construction in Szeged
  • Railway reconstruction works from Kelenföld (Budapest) – Székesfehérvár
PUBLIC AND MILITARY AIRPORT CONSTRUCTION
Runway, taxiway an tower construction and reconstruction on new and operating civil and military airports.
Liszt Ferenc Airport
construction of vehicle base, regional radartower and transmission building
Airport of Kecskemét
construction of plane parking places
Airport of Békéscsaba
runway and hydraulic construction works
Airport of Szeged
runway and hydraulic construction works
BRIDGE CONSTRUCTIONS
Brigde construction activity was initially established as part of motorway consruction. However, in the course of our development we became increasingly involved in the construction and reconstruction of independent ferro, concrete and mixed-structure bridges, most of which with prefabricated beam structures.
M3 motorway
between Füzesabony and Polgár
25 bridges
M3 motorway
between Görbeháza and Nyíregyháza
30 bridges
M7 motorway
between Szárszó and Ordacsehi
9 bridges
M7 motorway
between Nagykanizsa and Becsehely
24 bridges
M30 motorway
section 5+500-23+050 kms
10 bridges
Mezőkövesd
bypass section, Stage II.
3 bridges
Miskolc
bypass section
4 bridges
Hatvan
bypass section
3 bridges
Highway No.63
Székesfehérvár bypass section
8 bridges
Salgótarján
bypass section
4 bridges
M0 ring road
southern sector 2×3 lane
2 bridges
M86 motorway
Szeleste-Hegyfalu
12 bridges
Highway No. 68
Marcali bypass section
1 bridges
Highway No. 8
Székesfehérvár bypass section
2 bridges
Highway No. 62
Seregélyes bypass section
2 bridges
M3 motorway
between Nyíregyháza and Vásárosnamény
4 bridges
M6 motorway
between Dunaújváros and Szekszárd
3 bridges
M60 motorway
between Bóly and Pécs
9 bridges
M43 motorway
between Szeged and Makó
1 bridges
STRUCTURAL ENGINEERING
Listed below are a few of our considerable achievements as references in this particular field.
Nagyvárad (RO)
Lotus Plaza commercial and entertainment centre
Visegrád
Hotel Thermál Visegrád ****
Tatabánya
Plaza Vértes Center shopping centre
Siófok
Hotel Azúr ****
Budapest
Kisstadion reconstruction
ENVIRONMENTAL INVESTMENTS
Waste disposal construction, flood protection, highway embankments as flood protection, reservoirs and dams.
  • Construction of the Western-Balaton Regional waste-disposal
  • Pusztazámor, construction of solid waste dumping site
  • Nagykanizsa, Letenye, Zalakaros, construction of waste disposal facilities
  • South-Balaton and Sió Walley, construction of the regional and communal waste management system
  • Implementation of the Sajó-Bódva Valley regional waste management program
  • Relocation of the protection embankment of Lake Bivaly. The project included 780,000 m³ of earthworks to build a new section of the Tisza protection embankment. This contract was carried out between 2005 and 2008 in the value of USD 140 M
  • Dam Rovni reservoir construction in Szerbia
  • Poroszlói pool – wetlands dredging (Tisza Lake-project)
  • Berettyó River – protective dam developmen
  • Bodrogközi upper Tisza River and Bodrog River – left bank flood protection system development
  • Bereg – Flood reducing reservoir consruction, Stage I. and III.